<legend id="h4sia"></legend><samp id="h4sia"></samp>
<sup id="h4sia"></sup>
<mark id="h4sia"><del id="h4sia"></del></mark>

<p id="h4sia"><td id="h4sia"></td></p><track id="h4sia"></track>

<delect id="h4sia"></delect>
  • <input id="h4sia"><address id="h4sia"></address>

    <menuitem id="h4sia"></menuitem>

    1. <blockquote id="h4sia"><rt id="h4sia"></rt></blockquote>
      <wbr id="h4sia">
    2. <meter id="h4sia"></meter>

      <th id="h4sia"><center id="h4sia"><delect id="h4sia"></delect></center></th>
    3. <dl id="h4sia"></dl>
    4. <rp id="h4sia"><option id="h4sia"></option></rp>

        Abundant energy with sufficient supply
        CreateDate:2021.09.08

        Jiangmen is China's electric energy industry base, with a total installed capacity of nuclear power, thermal power and wind power exceeding 10 million kilowatts. It is the city with the best power supply situation in the Pearl River Delta. Taishan City is the first pilot area of "point to multipoint" direct power purchase in China. The average price of industrial electricity included in the pilot enterprises can be reduced by 0.11 yuan / kW. Taishan City, Kaiping City and Enping City were included in the East and West electricity price zones of Guangdong Province, among which the classified electricity price of large industrydecreased by more than 10%.

        Taishan nuclear power station is the largest cooperation project between China and France in the field of energy. Taishan nuclear power joint venture Co., Ltd., jointly invested and established by China Guangdong Nuclear Power Group, France electric power group and Guangdong Electric Power Group, is responsible for the construction and operation.Taishan nuclear power unit 1 started construction in 2009 and put into commercial operation on December 13, 2018. It is the first EPR nuclear power unit put into commercial operation in the world. The construction of unit 2 started in 2010, started to load on April 12, 2019, and successfully connected to the grid for power generation on June 23. On September 7, 2019, the world's second EPR (third generation nuclear reactor) unit was put into commercial operation.

        Briefing of This Website: Sitemap | Contact Us| About Us
        Copyright Jiangmen Municipal People's Government All Rights Reserved